52 Types of Drawings Used in Construction
How to Leverage Disruptive Technologies in the Construction Industry?
The Role of BIM in Smart Cities Development
Point Cloud to BIM for Conservation Architecture: A Revolution in Preservation
Building the Future: BIM Solutions for Las Vegas Architects & Builders
BIM Integration for Energy-Efficient High-Rise Construction
Let' Talk With Us For Your First Project
Through strategic planning, innovative problem-solving, and collaborative teamwork, we successfully navigated these challenges and achieved our project objectives. Our dedication to attention to detail and commitment to excellence ensured that we overcame obstacles and delivered a solution that met and exceeded expectations.
MEP DESIGN FOR HOTEL PROJECT
The client was MEP Design Consultant working for Contractor. Contractor need LOD 400 Fabrication detail coordinated drawings for construction to reduce rework.
The client was well- established MEP Design consultant. So, they want first LOD 300 model for drawings and then they gave us task to create more detailed model at LOD 400 with coordination and shop drawing creation.
The client was Sub Contractor. The total project area was 104,288 SF. They require LOD 400 Detailed clash free model for execution work to reduce rework on site.